For Proeco it represents the link with process engineering, i.e. the passage from the conceptual analysis of the different process stages to the design of complete lines, equipment, plants, and package systems.
At this stage we define the functional and typological characteristics of each equipment or system, as well as their position in a plant, and mechanical connections.
Main activities:
- Equipment list
- Line list
- Equipment Technical Data Sheets
- Assessment of nozzle position on the equipment
- Pipeline GA and detail drawings
- Piping isometric drawings
- Stress Analysis calculations
- Piping support dimension and position assessment
- Material list specification
- Purchased equipment technical specifications
- Paint and insulation technical specifications